140 Yio Chu Kang Tai Seng Christian Church

This project involves the reconstruction of an existing single storey church building into a conservation to front facade building with a 6 storey rear extension.

Before After

Scope of Work:

  1. Foundation & Structural Works:
    • Since the Church building was built in 1930, there is Asbestos Ceiling material found and removed by Specialist removal company.
  2. Foundation Work:
    • New bored piling works to support the higher rear extension block.
    • All new Structural works for a pre-war single storey building conversion to a 6 storey building.
  3. Conservation & Exterior Enhancements:
    • All timber facade windows and doors to restore to existing design including all pilaster mouldings, concrete corbels and cornices.
    • Front facade and Interlocking tiled roof to restore to existing design.
    • With the introduction of voluntary conservation to the front building facade, the church gets to keep the front land without further road reserve setback requirement.
  4. Interior Finishing:
    • High-quality tiling to create functional and aesthetically pleasing interior spaces.
  5. Interior Modifications:
    • Addition of iconic gallery seating at the main worship hall to enhance capacity and community experience.
    • Usage of acoustic ceiling and wall lining to improve the sound environment in worship halls.